Titelbild SENNEBOGEN Kundenmagazin AUSLEGER Winter 2020
double edition winter 2020/2021

BOOM

Prologue

THINKING IN GENERATIONS AND FOCUSSING ON THE FUTURE

Grundsteinlegung Service Center Steinach

Yes we are building again. Because whoever rests and stops, falls back. And it is precisely this willingness to take entrepreneurial risks that distinguishes our medium-sized, owner-managed family business SENNEBOGEN. 

Even though the foundation stone for our new Customer Service Center in Steinach, strategically ideally located on the B20 truck road and the A3 motorway, was already laid on 10 July 2020, the event is still very much alive in times of rare events. This milestone in the company‘s history forms the future basis for the further professionalization and expansion of all our after sales activities.

Customer Service, the spare parts center with state-of-the-art logistics, the SENNEBOGEN Vertriebsgesellschaft with its direct sales activities in Lower Bavaria and the Upper Palatinate, and the management of used and rental machines will all find a new home in the Customer Service Center from 2021.

Walter und Erich Sennebogen

SENNEBOGEN Insights

Technical contribution

dealer network

Apprenticeship

Job site reports from all over the world

Green Line

PICK & CARRY MACHINE 723 E-SERIES REVOLUTIONIZES YARD LOGISTICS

 

  • Germany

The Charlie Manz Blockhaus GmbH company in Germany has reinvented its logistics concept with a SENNEBOGEN timber handling machine. Large construction cranes have been replaced in their loading and unloading function by the manoeuvrable, powerful 723 E-series timber handler with a 119 kW diesel engine. 

Read job site report

 

Green Line

COPPER RECYCLING: SELECT METALS USES SENNEBOGEN 817 E FOR FASTER LOADING

 

  • Singapore

In search of a compact material handler that could process recyclable materials faster and more seamlessly in Singapore, Select Metals Pte Ltd turned to SENNEBOGEN's recycling specialist, the 17-ton 817 E series material handler.

READ JOB SITE REPORT

Green Line

Port material handling with SENNEBOGEN 870 crawler gantry , unloading of steel wire coils, loading of heavy cargo and bulk material

PORT MATERIAL HANDLING WITH SENNEBOGEN 870: DD SHIPPING NV UNLOADS STEEL WIRE COILS SAFELY

  • Belgium

For more flexibility on their two quays, the material handling experts at DD Shipping NV have invested in a stable crawler gantry solution: the efficient SENNEBOGEN 870 Hybrid E series ensures fast and easy loading and unloading of heavy cargo and bulk material.

READ JOB SITE REPORT

Green Line

SENNEBOGEN material handler 830 Mobile with 17 m equipment, feeding the baler, loading the truck, scrap handling, UK

SCRAP RECYCLING COMPANY SYNETIQ TURNS GREEN WITH SENNEBOGEN 830 E SERIES

  • Doncaster, UK

SYNETIQ, the largest salvage and vehicle recycling company in the UK, has invested in a new SENNEBOGEN 830 E series scrap material handler supplied by Molson Green.

Read job site report

Green Line

largest material handler in the world, SENNEBOGEN 895 with electric engine and rail gantry, 35 m reach, Ennshafen Austria

THE FINEST WORKPLACE IN THE PORT - DANUBIA SPEICHEREI RELIES ON SENNEBOGEN 895

  • Ennshafen, Austria

Together with SENNEBOGEN sales and service partner Ascendum Baumaschinen GmbH, the port specialists successfully completed the major project, the assembly and commissioning of the world's largest material handler.

READ JOB SITE REPORT

Multi Line

SENNEBOGEN telehandler 355 E with elevating cabin, waste recycling, Austria

TWO SENNEBOGEN 355 E TELEHANDLERS REPLACE THREE WHEEL LOADERS 

  • Austria

Using state-of-the-art systems, around 16,000 t of residual waste are processed at AWV Liezen each year, among other things. Recently two new SENNEBOGEN 355 E telehandlers were introduced to take on the material handling tasks previously carried out by three wheel loaders.

READ JOB SITE REPORT

Multi Line

SENNEBOGEN telehandler 355_Green goods recycling_Hahn Kompost

MODERN GREEN WASTE RECYCLING AT DISPOSAL SPECIALIST HAHN

  • Regensburg, Germany

Tons of wood, green waste and other recycling materials arrive here daily, are sorted, shredded, processed or composted. these tasks are handled by three SENNEBOGEN machines, from the small 355 E telehandler to the 825 E material handler.

READ JOB SITE REPORT

Crane Line

30 T HD DUTY CYCLE CRANE SUPPORTS THE WELL CONSTRUCTION FOR THE FUTURE DISTRICT COOLING PLANT

  •  Lyon Part-Dieu, France

Climate change can also be felt in the cities, which is why more and more public institutions in the city centre are operating a district cooling network. At the Mouton Duvernet metro station a SENNEBOGEN 630 R-HD supports the construction of such an innovative district cooling system.

READ JOB SITE REPORT

Crane Line

SENNEBOGEN CRANES SUPPORTING THE S-BAHN ROUTE PROJECT IN THE MIDDLE OF MUNICH

  • Munich, Germany

The inner-city construction sites are vibrating. Right in the middle: two SENNEBOGEN telescopic crawler cranes for 40 t and 120 t load capacity, as well as a SENNEBOGEN crawler crane stage V, which is suitable for lifting work up to 200 t.

READ JOB SITE REPORT

Crane Line

SENNEBOGEN 6133 telescopic crawler crane sheet pile installation work Singapore, waste water tunnel

TELESCOPIC CRAWLER CRANE 6133 E FOR SINGAPORE'S DEEP TUNNEL SEWAGE SYSTEM 

  • Singapore

Singapore is a global pioneer in sustainable water management and invests heavily in its Deep Tunnel Sewerage System (DTSS). A task for which the specialist silent piling technology and foundation engineering company Guan Chuan Engineering chose the SENNEBOGEN 6133 E telescopic crawler crane.

Read job site report

Crane Line

120 T TELESCOPIC CRAWLER CRANE IS THE ONLY CRANE TO MEET THE REQUIREMENTS 

  • Paris, France

With a lifting capacity of 120 t, the powerful SENNEBOGEN 6113 E telescopic crawler crane is the ideal partner for crane rental customers such as ENCO, who were able to rent the crane to Sefi-Intrafor for a highly complex project. 

READ JOB SITE REPORT

Crane Line

Brunsbüttel lock chamber", 100 t SENNEBOGEN 6100 HD duty cycle crane

SENNEBOGEN 100 T DUTY CYCLE CRANE IN CLAMSHELL GRAB OPERATION

  • Germany

The Brunsbüttel lock system forms the western entrance to the Kiel canal and now includes a fifth lock chamber. Also „on board“: The 100 t SENNEBOGEN 6100 E duty cycle crane in grab operation.

READ JOB SITE REPORT

Your contact person

Florian Attenhauser

SENNEBOGEN Maschinenfabrik GmbH

Sennebogenstraße 8
94315 Straubing

+49 (0) 9421 540-354