Foreword

we are continuing to invest in the future!

Walter Sennebogen

We have seen great growth in recent years, at around 10% above the market average. This has led to decisions being made in many areas that speed up the further expansion of the SENNEBOGEN Group. In May of this year, we were able to commission our new steel construction plant in Litér, Hungary, meaning that we now have two high-performance plants there.

The completely new Product Development Campus was built in Straubing, creating even better conditions for development, prototype construction and testing. These and other investments will ensure new opportunities for growth for the future. For our partners – dealers, customers, suppliers and employees – this provides certainty that we will continue on a successful path together.

On that note, I remain sincerely yours, Walter Sennebogen

WE SHOW

Interview

Company / Insights

Dealer network

Academy

Professional articles

Employees

top performance in training

Honoring long-standing employees

Training

"TINKERERS ARE WELCOME HERE"

Operational reports worldwide

SENNEBOGEN 822 G Recycling Rieger
SENNEBOGEN 822 G Recycling Rieger

RECYCLING COMPANY Relies on SENNEBOGEN FOR renewing the fleet

  • Linz, Austria

One of Austria's largest recycling companies, Rieger Entsorgungs GmbH, is currently modernizing its fleet of material handling machines. Recently, two new SENNEBOGEN material handling excavators were put into operation: the SENNEBOGEN 822 of the brand new G series.

READ JOBSITE REPORT

SENNEBOGEN 735 E Pieper Holz

Fuel savings IN THE SAWMILL: TWO 735 E WITH ELECTRIC travel DRIVE in operation

  • Olsberg, Germany

Up to 30% of fuel consumption can be reduced by using the new 735 E with electric drive. Pieper Holz in the Sauerland region of Germany has decided to supplement the log handling machines it is already successfully using with two diesel-electric 735 E Green Efficiency Drive.

REad Jobsite REPORT

demolition with the 45 t demolition machine SENNEBOGEN 830 E

Dismantling a building in just 2 days with a 45 t demolition machine

  • Straubing, Germany

Next to the railroad station site in Straubing was a warehouse silo that was no longer in use and was now being dismantled piece by piece by the SENNNEBOGEN demolition excavator 830 E and the demolition company PLANNERER. The rental machine was equipped with a fully hydraulic quick-change system and a demolition tong in order to carry out a controlled deconstruction.

READ JOBSITE REPORT

Demolition with a SENNEBOGEN 6300 HD

WORLD'S LARGEST dury cycle crane IN DEMOLITION: 10 t WRECKING BALL at a height of 75m

  • Porto Tolle, Italy

Ferraro Group, one of the leading demolition companies in Europe is dismantling the decommissioned thermoelectric power plant in Porto Tolle. Site coordinator Calogero Arnone is using the SENNEBOGEN 6300 HD, a device that can hit precise predetermined points at heights of up to 75 meters.

READ JOBSITE REPORT

SENNEBOGEN 683 telescopic crawler crane pipeline construction

PIPELINE CONSTRUCTION: NEW CONSTRUCTION OF A LIQUID GAS TERMINAL WITh the new 683 E

  • Piombino, Italy

A new LNG (German: Flüssiggas) terminal is being built in the Tuscan port city of Piombino. The main contractor for the pipeline construction is the Italian subsidiary of Max Streicher, which is using the brand new 80 t SENNEBOGEN 683 E crawler telescopic crane for the major project.

READ JOBSITE REPORT

SENNEBOGEN 673 Viaduct construction Singapore

CHALLENGING VIADUCT CONSTRUCTION IN SINGAPORE: CONSTRUCTION OF THE TAMPINES VIADUCT OVER EXISTING ROAD

  • Singapur

The construction of the new Tampines viaduct presents some challenges. Assembly has to take place in a confined space, and there is little room to carry out the heavy lifting work. As an expert in this field, Hwa Seng Builder Pte Ltd (HSB), a leading provider of civil engineering and construction services, was contracted to use a 70 t crawler telescopic crane from SENNEBOGEN.

READ JOBSITE REPORT

SENNEBOGEN 355 E, recycling centre, telehandler more flexible than wheel loader

NEW RECYCLING CENTER IN SWEDEN RELIES ON TELEHANDLERS

  • Vara, Sweden

The state-of-the-art Heljeved recycling center, which accepts waste from private households, opened in Vara, Västgötaslätten. Avfall & Återvinning Skaraborg's 30,000 m² facility is roadworthy, sustainable and flexible for current and future requirements.

READ JOBSITE REPORT

SENNEBOGEN 340 G, Telehandler, Salt loading, Loading snowplough

LOADING SNOWPLOUGHS: ROAD MAINTENANCE COMPANY RELIES ON TELEHANDLERS

  • Chemnitz, Germany

The Hainichen road maintenance depot is well prepared for the winter. Up to 1,200 tons of road salt can be stored in the warehouse. With the help of the SENNEBOGEN 340 G telescopic loader, these masses are moved efficiently and safely between the hall, silos and winter service vehicles.

READ JOBSITE REPORT

Subscribe to our customer magazine and receive your personal issue free of charge by mail.